Performance Solution Scenario:
Reduced Room Height

Identified Design Issue

The existing building has reduced vertical headroom.

Departure from Deemed-to-Satisfy Provisions

Due to existing limitations, the ceiling height/headroom clearance inside the room will be less than 2400mm and will require significant rebuilding to address the issue.

The Performance Solution

The use of the building could be considered to confirm that the intended functional use and activities in each area are not affected by the reduced ceiling height.

This example is a hypothetical scenario and must not be used for any specific project.

Assessments must be tailored for each project.

Contact us to learn more. We are experts at preparing Performance Solution Reports.

Disclaimer: This publication provides general information only and does not constitute legal, certification or project-specific advice. Requirements may vary between projects and change over time. Always verify the current NCC, legislation and applicable Australian Standards, and obtain project-specific advice where required.